So I figured i'd start a new post for this because... we are done with our relay rack and on our way to finishing the main server rack.
The server rack doesnt have any wire management yet. We just threw the servers in tonight to see how loud it was. Whats VERY surprising is that our single PoE switch in our relay rack is louder then all of the servers + battery backups (combined). VERY strange. I figured the 2U servers would be very loud, as i know they can be very loud since I built them... but go figure.
Anyway we spent about 10-12 hours at the office today finishing the wiring. I worked on the wiring last week as you probably saw in my other post, but finished it today. I went with 2 25pair of wires for my phone system which saved a TON of time and a TON of space. Very glad I followed some suggestions from HardOCPr's on that. Anyway here are some pics from today:
Video: http://www.facebook.com/Vyc0r+++++++profile#!/video/video.php?v=1290471097289&ref=mf
Wiring up the phone wires (i used the 25th pair as a wire tie to keep wires together, worked great)
All equipment in... now we just need to wire in the patches (the top "blank" cover is actually a cover on my 4U shelf... which will house 2 cable modems for phones and then our Cisco/Ultra routers/modems for our internet)
We made a mess out of my workshop:
Back of server rack as we began installing servers. Im missing a few as they are in a live production environment right now and i can't take them down yet
Missing my Ghost server, which is in another office being used (top server is my HTPC for my office actually)
The bottom server is our DVR... which is why theres so many different ports. Dual video cards, dual 16 channel camera cards and other accessories)
Hooked up the wires to test things out
Not bad for a Saturdays worth of work. Tommorrow i'll go in and start wire management on the server rack and I need to start dropping some wires. I think i'll test out my HTPC in my office tomorrow with my TV.
The server rack doesnt have any wire management yet. We just threw the servers in tonight to see how loud it was. Whats VERY surprising is that our single PoE switch in our relay rack is louder then all of the servers + battery backups (combined). VERY strange. I figured the 2U servers would be very loud, as i know they can be very loud since I built them... but go figure.
Anyway we spent about 10-12 hours at the office today finishing the wiring. I worked on the wiring last week as you probably saw in my other post, but finished it today. I went with 2 25pair of wires for my phone system which saved a TON of time and a TON of space. Very glad I followed some suggestions from HardOCPr's on that. Anyway here are some pics from today:
Video: http://www.facebook.com/Vyc0r+++++++profile#!/video/video.php?v=1290471097289&ref=mf
Wiring up the phone wires (i used the 25th pair as a wire tie to keep wires together, worked great)




All equipment in... now we just need to wire in the patches (the top "blank" cover is actually a cover on my 4U shelf... which will house 2 cable modems for phones and then our Cisco/Ultra routers/modems for our internet)




We made a mess out of my workshop:


Back of server rack as we began installing servers. Im missing a few as they are in a live production environment right now and i can't take them down yet

Missing my Ghost server, which is in another office being used (top server is my HTPC for my office actually)

The bottom server is our DVR... which is why theres so many different ports. Dual video cards, dual 16 channel camera cards and other accessories)




Hooked up the wires to test things out


Not bad for a Saturdays worth of work. Tommorrow i'll go in and start wire management on the server rack and I need to start dropping some wires. I think i'll test out my HTPC in my office tomorrow with my TV.
Last edited: