And some cabling pr0n:
This is a rack from a previous employer, mostly user ports and patch panels to other racks on the row. Time, neglect and sloppiness are how it arrived at this state. I gutted the entire rack, replaced some switches and installed shorter cables (2ft vs 7-10ft) and some Neat Patch boxes.
The garbage gear in that rack (Cat Express 500's, Linksys junk) were all replaced with 3560-48PS's, and the 3750G core with a 4948-10GE shortly afterwards.
This is a rack from a previous employer, mostly user ports and patch panels to other racks on the row. Time, neglect and sloppiness are how it arrived at this state. I gutted the entire rack, replaced some switches and installed shorter cables (2ft vs 7-10ft) and some Neat Patch boxes.
The garbage gear in that rack (Cat Express 500's, Linksys junk) were all replaced with 3560-48PS's, and the 3750G core with a 4948-10GE shortly afterwards.