Ok, well its not a datacenter.... at all really.... hahaha
To give some background, I just graduated from school in RI and I moved back with my family in NJ. Im *temporarly* staying with my parents, working from home(SCORE!) doing network engineering and Tier III support for a wifi company.
Im living in the basement right now, and had to make some necessary changes
I want to start with some older pics of how the network used to look when I was in school in RI. ON TO THE PICS
Pretty much the only pic I had, though the rack was completly full when I left. as you can probably tell the servers were stacked, which is the worst possible way to rack anything IMHO becuase if anything shits the bed, you have the derack so much stuff just to get to the server.
well i didn't want to put everything on shelfts, so I got myself some
^YAY!
Even though two of those boxes don't have machines in them, I have all the hardware sitting around. I just have to be "not lazy".
some wiring that goes to the outside(office) room and parents office. This is temporary and will be put into cable sleveing.
Very Temporary patch cabling. I still have another 6 or so things to put into the relay rack before ill be finished.
Heres my office workstation before the paint im putting on the walls.
And the final picture, my workstation. Paint is over exposed, oh well.
Well, ill be posting kinda like a progress pictures until im finished. Let me know what you guys think.
To give some background, I just graduated from school in RI and I moved back with my family in NJ. Im *temporarly* staying with my parents, working from home(SCORE!) doing network engineering and Tier III support for a wifi company.
Im living in the basement right now, and had to make some necessary changes
I want to start with some older pics of how the network used to look when I was in school in RI. ON TO THE PICS

Pretty much the only pic I had, though the rack was completly full when I left. as you can probably tell the servers were stacked, which is the worst possible way to rack anything IMHO becuase if anything shits the bed, you have the derack so much stuff just to get to the server.
well i didn't want to put everything on shelfts, so I got myself some

^YAY!





Even though two of those boxes don't have machines in them, I have all the hardware sitting around. I just have to be "not lazy".


some wiring that goes to the outside(office) room and parents office. This is temporary and will be put into cable sleveing.



Very Temporary patch cabling. I still have another 6 or so things to put into the relay rack before ill be finished.

Heres my office workstation before the paint im putting on the walls.


And the final picture, my workstation. Paint is over exposed, oh well.
Well, ill be posting kinda like a progress pictures until im finished. Let me know what you guys think.