We moved the IT/Engineering/Apps Departments from the 2nd to the 3rd floor. With that comes a brand new datacenter.
After the conduit was ran in the cieling, walls finished, and ceiling 75% done.
Another angle of above
Our 2nd floor switch/patch panel temporarily.
Conduit. Thought it would be cool to see it fill up throughout the process.
Walls and ceiling done, and the raised floor is beginning.
Looking good! Raised floor.
Another angle of the raised floor.
Taken today. Floor and ramp done
Our cabling contractor wastes no time. 2 Racks/Patch Panels for the phones, since they are getting switched over this weekend.
To the entry.
Neat cabling work, couldnt have done it better, that's why they do it.
Part of our Liebert UPS system. We are also getting a Diesel Gen. hooked up this weekend. Transformer and breaker panel.
Close up of the beastly transformer. That thing packs a punch!
Dedicated breakers for the data center.
You can see the primary power in the back left, going directly to the Liebert system.
Conduit filling up.
Soon we will be getting the rest of the racks put in, our Liebert system finished off, move the servers, and then our 20TB Hitachi SAN system

After the conduit was ran in the cieling, walls finished, and ceiling 75% done.

Another angle of above

Our 2nd floor switch/patch panel temporarily.

Conduit. Thought it would be cool to see it fill up throughout the process.

Walls and ceiling done, and the raised floor is beginning.

Looking good! Raised floor.

Another angle of the raised floor.

Taken today. Floor and ramp done

Our cabling contractor wastes no time. 2 Racks/Patch Panels for the phones, since they are getting switched over this weekend.

To the entry.

Neat cabling work, couldnt have done it better, that's why they do it.

Part of our Liebert UPS system. We are also getting a Diesel Gen. hooked up this weekend. Transformer and breaker panel.

Close up of the beastly transformer. That thing packs a punch!

Dedicated breakers for the data center.

You can see the primary power in the back left, going directly to the Liebert system.

Conduit filling up.
Soon we will be getting the rest of the racks put in, our Liebert system finished off, move the servers, and then our 20TB Hitachi SAN system